Bottom line first: A new sodium-ion UPS cabinet packs 333 kW of output into just 73.1 kWh of storage. That is a 4.6C battery. It can empty itself in about 13 minutes. For AI data centers, that ratio matters more than the chemistry headline. Backup batteries for GPU halls are now sized by power, not by energy. Here is the math behind the spec sheet.
What happened: a sodium-ion UPS built for AI load swings
On November 19, 2026, Proper Voltage launched Salt Vault, a UPS battery cabinet built on UNIGRID's sodium-chromium oxide (NCO) sodium-ion cells. The company says AI training and inference clusters swing from idle to peak in milliseconds, and that these repeated transients wear out backup batteries. Deliveries to early adopters are expected from April 2027.
The Salt Vault 480VDC datasheet lists the numbers we will use:
- Energy: 73.08 kWh from 12 packs, using UNIGRID 70 Ah Na-ion cells
- Power: 333 kW
- Voltage: 522 VDC nominal, 360–612 VDC range
- Current: 700 A discharge, 140 A charge (full rack)
- Cycle life: 10,000 cycles "at standard charge/discharge currents"
- Size and mass: 48U, 914 × 965 × 2,299 mm, 1,261 kg, air-cooled
- Temperature: discharge −20 to 40 °C, charge 0 to 40 °C
It is not alone. At RE+ the same week, LG Energy Solution showed a concept that pairs sodium-ion batteries with a solid-state transformer to handle AI demand swings. Torus launched Foundry on November 11 with a flywheel-plus-battery system for ramp-rate support.
Key point
AI backup is power-limited, not energy-limited. An 800 kW rack needs only about 11 kWh for 50 seconds of hold-up, but it needs 800 kW of discharge capability. A sodium-ion UPS wins or loses on C-rate, current limits and cycle life, not on Wh/kg.
1. Sodium-ion UPS C-rate: 333 kW from 73 kWh
C-rate is power divided by energy:
C = P / E = 333 kW / 73.08 kWh ≈ 4.6C → ideal run time t = 60 / 4.56 ≈ 13.2 min
The datasheet's own run-time table shows what really comes out at high rate. Multiply load by run time for one cabinet:
- 300 kW × 12 min = 60 kWh (about 82% of nameplate)
- 200 kW × 19 min = 63 kWh (about 87%)
- 100 kW × 38 min = 63 kWh (about 87%)
- 50 kW × 88 min = 73 kWh (about 100%)
So about 18% of the energy is unavailable at near-full power, from voltage sag, internal loss and cut-off limits. The table is marked "preliminary", so treat these as indicators. The density numbers tell the same story. At cabinet level it is 73,080 Wh / 1,261 kg ≈ 58 Wh/kg, but 333 kW / 1,261 kg ≈ 264 W/kg. This is a power product.
2. Voltage window and current limit: where 333 kW runs out
Power is P = V × I, and the bus voltage falls as the battery discharges. With a 700 A discharge limit:
- At 612 V (full): 700 × 612 ≈ 428 kW available
- At 522 V (nominal): 333 kW needs 333,000 / 522 ≈ 638 A, inside the limit
- At 360 V (empty): 700 × 360 ≈ 252 kW maximum
The crossover is 333,000 / 700 ≈ 476 V. Below that voltage, full 333 kW is no longer possible at 700 A. This is one reason the run-time table loses energy at high load. It is also why Proper Voltage puts its "bOS" voltage-control software at the center of the pitch. The 612/360 = 1.7:1 swing must be handled somewhere before it reaches a UPS that expects a steady DC link.
The amp-hours also check out. 73,080 Wh / 522 V ≈ 140 Ah, which equals two 70 Ah cells in parallel. On that basis, 700 A is a 5C discharge and 140 A is a 1C charge. Twelve packs also give 73.08 / 12 ≈ 6.1 kWh per pack. The 2P layout is my inference, not a published spec. Cable heat matters too. The datasheet asks for at least 120 mm² cable. Copper at that size is about 0.14 mΩ per metre, so 700 A dissipates I²R ≈ 700² × 0.000143 ≈ 70 W per metre of conductor.
3. Recharge math: a 5C battery that charges at 1C
Discharge is fast, but charge is not. At 140 A and nominal voltage:
Pcharge ≈ 140 A × 522 V ≈ 73 kW → a full refill takes at least about 1 hour
Take a 5-minute ride-through at full power. It uses 333 × 5 / 60 ≈ 27.8 kWh. Putting that back at 73 kW takes about 23 minutes, before charger losses and any constant-voltage taper. If a second grid event arrives inside that window, the cabinet starts it partly empty. Site design should size for back-to-back events, not just a single outage.
Temperature also matters. The cabinet can discharge down to −20 °C but only charges from 0 °C. A cold, unheated battery room could deliver one ride-through and then be unable to recharge. Sodium-ion is often promoted for cold tolerance, but this limit still needs a heated space or pre-warming.
4. Cycle-life math: 10,000 cycles under AI load swings
If 10,000 cycles means full equivalent cycles, the lifetime throughput is:
10,000 × 73.08 kWh ≈ 731 MWh
A classic UPS that only sees outages and monthly tests will never use that up; calendar ageing will decide its life. A UPS that also smooths GPU swings is different. Here is an illustration with my own assumptions, not vendor data. The cabinet covers a 100 kW swing for 2 s, every 10 s, all day:
- Energy per swing: 100 kW × 2 s = 200 kJ ≈ 0.056 kWh (0.08% depth of discharge)
- Swings per day: 86,400 / 10 = 8,640
- Daily throughput: 8,640 × 0.056 ≈ 480 kWh ≈ 6.6 full equivalent cycles
- Life: 10,000 / 6.6 ≈ 1,520 days ≈ 4.2 years
Shallow cycles usually age a cell far less than full cycles, so a simple equivalent-cycle count is likely pessimistic. Still, the example shows why the vendor targets transient wear. It also explains the split we covered in AI Power Smoothing Explained. Capacitors and flywheels take the millisecond spikes. Batteries take the seconds-to-minutes energy. Torus pairs a flywheel with batteries for exactly this reason.
To verify
- The 10,000-cycle rating has no stated depth of discharge, rate or temperature. Shallow-cycle ageing data for NCO cells is not public.
- The 2P cell layout, the series cell count and the cell nominal voltage are inferred or unpublished.
- How the 360–612 V cabinet "adapts to 800V architectures" (DC/DC stage or series stacking) is not described.
- The run-time table is preliminary and based on cell data. No independent test results or pricing have been released.
- "Zero fire propagation risk" is a company claim. The UL9540A listing on the datasheet should be checked for test details.
Sodium-ion UPS takeaways for AI data center design
- Size by power first: 800 kW for 50 s is only 11.1 kWh, but needs 800 / 333 ≈ 2.4, so 3 cabinets by power. Energy is a by-product.
- Check the low-voltage corner: at 700 A, full 333 kW needs at least about 476 V. At 360 V the cabinet tops out near 252 kW.
- Plan for recharge time: 1C charge means about an hour to full. Design for back-to-back events.
- Count cycles honestly: load smoothing can add several equivalent cycles per day. Ask for shallow-cycle test data.
- 800 VDC needs a bridge: 612 V maximum is below an 800 V bus. Compare with the rack-level backup in our 800 VDC Power Rack Explained post.
Related reading and video
- 800 VDC Power Rack Explained: The Current, Hold-Up and Pulse-Power Math Behind Vertiv's Rack, Pod and Data-Hall Options
- AI Power Smoothing Explained: The Capacitor, Battery and Ramp-Rate Math Behind Envision's 800 V DC Data Center
- Video: Running on Salt? How Sodium-ion Batteries are Ending the Lithium Monopoly
Sources: Proper Voltage press release, Nov 19, 2026; Salt Vault 480VDC datasheet; Proper Voltage Critical Power page; pv magazine, Nov 20, 2026; Mission Critical Research on LGES at RE+, Nov 19, 2026; Torus Foundry launch, Nov 11, 2026. Calculations by The Engineering Core.